Talison Lithium
Tailings Dam — Bituminous Geomembrane Liner
Bituminous Geomembrane Liner ES1 & ES3 — 600,000m² of installed BGM.
Project detail
| Client | Talison Lithium |
|---|---|
| Engineer | GHD |
| Purpose | Tailings dam |
| Manufacturer | Coletanche |
| Materials | Bituminous Geomembrane Liner ES1 & ES3 |
| Quantities | 600,000m² of installed BGM |
| Duration | 12 months (completed June 2025) |