Talison Lithium

Tailings Dam — Bituminous Geomembrane Liner

Bituminous Geomembrane Liner ES1 & ES3 — 600,000m² of installed BGM.

Tailings Dam — Bituminous Geomembrane Liner

Project detail

Client Talison Lithium
Engineer GHD
Purpose Tailings dam
Manufacturer Coletanche
Materials Bituminous Geomembrane Liner ES1 & ES3
Quantities 600,000m² of installed BGM
Duration 12 months (completed June 2025)

On site

Tailings Dam — Bituminous Geomembrane Liner — site photo
Tailings Dam — Bituminous Geomembrane Liner — site photo